2001 – Warnow Tunnel, Rostock – Warnemuende, Construction pit East
Project
Warnow Tunnel between Rostock and Warnemuende – construction pit East
Construction period: 1999 – 2003
Client
Baugrund Stralsund Ingenieurgesellschaft mbH
Carl-Heydemann-Ring 55
18437 Stralsund
Activities
- 3D ground water modelling for the construction pit East with GMS (Finite-Difference-Codes MODFLOW)
- Calibration of the model on the base of existing groundwater measures
- Simulation of a single-phase cut-off wall and resulting from it the groundwater levels and remaining water quantities
- Simulation of leakages within the cut-off wall
- Assessment of groundwater flow calculations regarding the causes for the high water amount in the construction pit
Period of activities: 2001