2001 – Warnow Tunnel, Rostock – Warnemuende, Construction pit East

Project

Warnow Tunnel between Rostock and Warnemuende – construction pit East
 
Construction period: 1999 – 2003


Client

Baugrund Stralsund Ingenieurgesellschaft mbH
Carl-Heydemann-Ring 55
18437 Stralsund

  
Activities

  • 3D ground water modelling for the construction pit East with GMS (Finite-Difference-Codes MODFLOW)
  • Calibration of the model on the base of existing groundwater measures
  • Simulation of a single-phase cut-off wall and resulting from it the groundwater levels and remaining water quantities
  • Simulation of leakages within the cut-off wall
  • Assessment of groundwater flow calculations regarding the causes for the high water amount in the construction pit

Period of activities: 2001