2001 – New Building of the Microchip FAB SAW Components Dresden
Project
New Building of the Microchip FAB
SAW Components
Construction period: 2000 – 2001
Client
SAW Components Dresden GmbH
Manfred-von-Ardenne-Ring 7
01099 Dresden
Activities
- Site supervision in the construction phase of a specially arched foundation with 4.2 m depth meeting high vibration engineering requirements
- Instructions for the emplacement of excavation material consisting of heath sand sensitive against dislocations
- Determinations for the re-filling of foundation trenches of filigree formwork
- Final inspection of construction pit and density tests of excavation and foundation levels and re-fillings
- Supervision of foundation trenches underneath the baseplate of the cleanroom in the construction phase
- Supervision of test fields for the determination of applicable compaction technologies
Period of activities: 2000 – 2001