Activities

  • Site supervision in the construction phase of a specially arched foundation with 4.2 m depth meeting high vibration engineering requirements
  • Instructions for the emplacement of excavation material consisting of heath sand sensitive against dislocations
  • Determinations for the re-filling of foundation trenches of filigree formwork
  • Final inspection of construction pit and density tests of excavation and foundation levels and re-fillings
  • Supervision of foundation trenches underneath the baseplate of the cleanroom in the construction phase 
  • Supervision of test fields for the determination of applicable compaction technologies

Period of activities: 2000 – 2001