2003 – Congress Centre Dresden
Project
Congress centre Dresden
Construction period: 2001 – 2004
Client
ARGE Kongresszentrum
(Ed. Zueblin AG, DYWIDAG)
Activities
- Consultancy concerning the pile foundation
- Geotechnical construction consultancy and control
- Monitoring of pile loading tests (large bored piles and GEWI piles)
- Conception for additional savings against hydrostatic uplift with floods
Period of activities: 2001 – 2003