2003 – Congress Centre Dresden

Project

Congress centre Dresden 
  
Construction period: 2001 – 2004

  
Client

ARGE Kongresszentrum
(Ed. Zueblin AG, DYWIDAG)

   
Activities

  • Consultancy concerning the pile foundation
  • Geotechnical construction consultancy and control
  • Monitoring of pile loading tests (large bored piles and GEWI piles)
  • Conception for additional savings against hydrostatic uplift with floods

Period of activities: 2001 – 2003

< Back to references