2010 – Airport Sheremetjeovo II in Moscow (Russia)

Project

Airport Sheremetjeovo II in Moscow (Russia)
new terminal, new rail way station   
 
Construction period: 2007 – 2010


Client

Assmann Beraten + Planen GmbH
Reichenbachstrasse 55
01069 Dresden 

    
Activities (still in progress)

  • Interpretation and evaluation of the geological report
  • Development of a foundation concept
  • Supervision and interpretation of drillings during second geological exploration
  • Geotechnical consulting
  • Excavation pit acceptance
  • Foundation design according to Russian standards for spread foundations, driven piles, bored piles
  • Supervision and interpretation of pile driving tests and pile load tests

Period of activities: 2007 – 2010