2002 – High Speed Railway Line Berlin – Hanover, Bridge “Letzlinger Kurve”

Project

High speed railway line Berlin – Hanover
section Oebisfelde – Staaken
New railway overbridge „Letzlinger Kurve“
Bored pile foundation in the area of the slab track system
  
Construction period: 2001

  
Client

DB Projekt Verkehrsbau GmbH
Project centre Hanover
Joachimstrasse 8
30159 Hanover


Activities

  • Geotechnical statement on the foundation concept with proposals to protective measures and measures for conservation of evidences
  • Geotechnical evaluation of lengths of sheet pile walls with dynamic loads at a speed of v = 250 km/h
  • Conservation of evidence with heavy dynamic probings for the assessment of subsoil loosenings resulting from bored pile constructions
  • Construction control during the construction phase of bored pile foundations and at the pressing in of sheet pile walls
  • Final geotechnical report

Period of activities: 2001 – 2002