2005 – High Speed Railway Line Berlin – Hanover, Section Dallgow

Project

High speed railway line Berlin – Hanover
section Dallgow
Exploration and rehabilitation of damages resulting from settlement at the slab track system by high dynamic loads
  
Constuction period: 2000 – 2002

  
Client

DB Netz AG
Branch East
Net area Wustermark
An der B5
14641 Wustermark

  
Activities

  • Investigations of soil and damages
  • Geotechnical expertise on causes of settlements
  • Soil dynamical measurements including analysis and interpretation
  • Concepts for an immediate protection and for permanent rehabilitations
  • Tender documents of permanent rehabilitation
  • Construction control of rehabilitation measures including control probes and dynamic measurements
  • Final geotechnical report

Period of activities: 2000 – 2005