2006 – New Cargo Transport Centre FIEGE in Hamburg Moorfleet

Project 

New build cargo transport centre FIEGE in Hamburg Moorfleet,
1st and 2nd construction stage   
  
Construction period: 2005 – 2006

  
Client

1st construction stage
Prof. Dr.-Ing. Thomas Neidhart
Consulting Engineer
Assmannstrasse 9
93049 Regensburg

2nd construction stage
GOLDBECK Bau GmbH
Ummelner Straße 4 - 6
33649 Bielefeld 

  
Activities

  • 2D and 3D finite element analyses to verify deformations of the floor and the columns of the hall
  • Verification of the bearing capacity of the stabilisated soil layer over the Controlled Modulus Columns (CMC) and design of the ground slab for extreme load conditions e.g. failure of the subgrade reaction
  • Detailed design of the column foundations

Period of activities: 2005 – 2006