2003 – Motorway A 9 Nuremberg – Berlin near Schleiz

Project

Motorway BAB A 9 Nuremberg – Berlin near Schleiz,
Extension to 6 lanes
  
Construction period: 2002 – 2003


Client

Josef Raedlinger GmbH
Poststrasse 100
04600 Altenburg


Activities

  • Geotechnical and civil engineering consulting
  • Geotechnical consulting during construction period especially regarding design and protection of rock and soil slopes at cuttings up to the depth of 15 m
  • Innovative solutions for slope protection during construction period with cement stabilizations

Period of activities: 2001 – 2003

< Back to references