2004 – Upgraded Railway Line Dresden – Berlin, Railway Bridge Frauenhain

Project   

Upgraded railway line Dresden – Berlin
new railway bridge Frauenhain
   
Construction period: 2002 – 2003

   
Client

DB ProjektBau GmbH
Project centre Berlin
Ordensmeisterstrasse 15-16
12099 Berlin

   
Activities

  • Geotechnical expertise and consulting
  • Statistic assessment of groundwater levels
  • 3D-Simulations of groundwater flows with GMS
  • Groundwater monitoring in the area of groundwater well
  • Monitoring of harmlessness of chemical and microbiological parameters of displacement waters
  • Release for infiltrations
  • Dimensioning of a infiltration basin
  • Hydrogeological consulting for the avoidance of threatening potentials

Period of activities: 2003 – 2004

< Back to references