2006 – New Railway Line Nuremberg – Ingolstadt, Middle Lot

Project

New railway line Nuremberg – Ingolstadt, Middle Lot
High speed railway line
 
Construction period: 1998 – 2006

  
Client

DB ProjektBau GmbH
Branch South
Project centre Nuremberg 1
Oedenberger Strasse 55
90491 Nuremberg

  
Activities

  • Permanent collaboration in the study group for the risk control in karst rock formations
  • Collaboration at the realisation of a catalogue of measures
  • Advices to exploration concepts of karst structures
  • Evaluation of geophysical and geotechnical exploration results
  • Determination of necessary civil engineering measures

Period of activities: 1998 – 2006