2006 – New Railway Line Nuremberg – Ingolstadt, Lot North
Project
New railway line Nuremberg – Ingolstadt, Lot North
High speed railway track
Construction period: 1998 – 2006
Client
DB ProjektBau GmbH
Branch South
Project centre Nuremberg 1
Oedenberger Strasse 55
90491 Nuremberg
Activities
- Theoretical and experimental investigations of swelling behaviour
- Concepts for the control of swelling heaves in the cuttings
- Prognoses of swelling heaves for the proof of permissible heave degrees concerning the warranty of position accuracy
- Advices for construction engineering measures
- Approval planning for the soil exchanges concerning the control of swelling
- Construction control during soil exchanges
- Construction monitoring of slab tracks in the section Fischbach/Feucht
Period of activities: 1998 – 2006