2006 – New Railway Line Nuremberg – Ingolstadt, Lot North

Project

New railway line Nuremberg – Ingolstadt, Lot North
High speed railway track
  
Construction period: 1998 – 2006


Client

DB ProjektBau GmbH
Branch South
Project centre Nuremberg 1
Oedenberger Strasse 55
90491 Nuremberg


Activities

  • Theoretical and experimental investigations of swelling behaviour
  • Concepts for the control of swelling heaves in the cuttings
  • Prognoses of swelling heaves for the proof of permissible heave degrees concerning the warranty of position accuracy
  • Advices for construction engineering measures
  • Approval planning for the soil exchanges concerning the control of swelling
  • Construction control during soil exchanges
  • Construction monitoring of slab tracks in the section Fischbach/Feucht

Period of activities: 1998 – 2006