2006 – New Railway Line Nuremberg – Ingolstadt, Lot South
Project
New railway line Nuremberg – Ingolstadt, Lot South
High speed railway line
Construction period: 1998 – 2006
Client
DB ProjektBau GmbH
Branch South
Project centre Nuremberg 1
Oedenberger Strasse 55
90491 Nuremberg
Activities
- Protection of slopes in cuttings in difficult soil and groundwater relations
- Realisation of improved soil models in consideration of difficult soil and groundwater relations
- Feasibility studies for slope protections with dowels and supporting plates
- Feasibility study and determination of planning foundations for a tunnel in cut-and-cover method
- Feasibility study for the proof of effenciency of track protection with geogrid constructions under embankments in railway line sections endangered by karst and depression
Period of activities: 1998 – 2006