2007 – High Speed Railway Line Wuhan – Guangzhou (China)
Project
Wuhan – Guangzhou Railway Passenger Dedicated Line
Consulting during planning and execution of slab track system
(track length approx. 1000 km, design speed 350 km/h)
Construction period: since 2005
Client
Obermeyer Planen + Beraten GmbH
Hansastraße 40
80686 Munich (Germany)
Activities
- Administration of the section track system / slab track
- Examination of approval and execution planning of slab tracks e.g. in respect to
- Slab track design
- Suitability of track system for special planning requirements (e.g. requirements of control and safety technology)
- Planning standards for track system of earth work constructions, bridges and tunnels
- Detail planning - Consulting for slab track planning and execution e.g.
- Choosing a suitable slab track system - Estimation of technical reliability
- Education of the Chinese business partners
Period of activities: 2006 – 2007