2007 – High Speed Railway Line Wuhan – Guangzhou (China)

Project

Wuhan – Guangzhou Railway Passenger Dedicated Line
  
Consulting during planning and execution of slab track system
(track length approx. 1000 km, design speed 350 km/h)
 
Construction period: since 2005

  
Client

Obermeyer Planen + Beraten GmbH
Hansastraße 40
80686 Munich (Germany)
  

Activities

  • Administration of the section track system / slab track
  • Examination of approval and execution planning of slab tracks e.g. in respect to
    - Slab track design
    - Suitability of track system for special planning requirements (e.g. requirements of control and safety technology)
    - Planning standards for track system of earth work constructions, bridges and tunnels
    - Detail planning
  •  Consulting for slab track planning and execution e.g.
    - Choosing a suitable slab track system - Estimation of technical reliability
    - Education of the Chinese business partners

Period of activities: 2006 – 2007