2006 – Herrenteich Dam

Project

Dam of the Impounding Reservoir Herrenteich
Modification of the flowover spillway to lower the impounding reservoir water level during flood water events

Construction period: 2006


Client

Thueringer Fernwasserversorgung
(Thuringian long-distant water supply)
Haarbergstrasse 37
99097 Erfurt


Activities

  • Design for modification of the flowover spillway to improve the overflow and structural safety of the dam (earth-fill dam, height 15 m high, length 240 m, constructed 1988, damage of the upper dam cross section by moisture penetration) according to HOAI part VII including:
  • Phase 2 preliminary design study
  • Phase 3 draft design
  • Phase 5 implementation planning
  • Phase 6 supporting the client during the preparation of the building contract placing
  • Phase 7 supporting the client during placing of orders
  • Phase 8 site management
  • Phase 9 documentation

Period of activities: 2005 – 2006