2007 – Midland Canal – Stability of Embankments

Project 

Midland canal
Midland canal-km 90,450 to 97,470 and midland canal-km 101,510 to 106,600
  
Geotechnical report and stability analysis of embankments within the dam section and in the area of transverse structures
  
Construction period: -


Client

Water and Shipping Authority Minden
Am hohen Ufer 1 – 3
32425 Minden 

  
Activities

  • Exploration programme
  • Consulting services during exploration works and construction of groundwater monitoring wells
  • Laboratory tests
  • Geotechnical assessment of ground and embankment structure
  • Documentation of the plant cover on embankments
  • Stability and serviceability analyses of existing embankments
  • Numerical calculations of the dam's flow through and underflow
  • Slope failure calculations
  • Proof of suffosion and erosion resistance, proof of safety against hydrostatic uplift and hydraulic heave
  • Report on stability
  • Solutions for rehabilitation in case of insufficient stability

Period of activities: 2005 – 2007