2007 – Neckar culvert Esslingen-Sirnau

Project 

Neckar culvert Esslingen-Sirnau 
  
Stability analyses of dams between shipping canal and the river Neckar for the proper structural condition and for the final condition 
 
Construction period: 2006 – 2008


Client

LEONHARD WEISS GmbH & Co. KG
Bauunternehmung Leonhard-Weiss-Strasse 22
73037 Goeppingen


Activities

  • Numerical analysis by finite element method of seepage (using vertical-plain steady state groundwater models) for construction stage 1 “Construction pit for a discharge unit” and construction stage 2 “Construction pit for a drawdown unit” (load case 2 and 3) as well as analogous model 1 to 3 according to MSD for the final stage (load case 1 to 4)
  • Stability analysis for both construction stages 1 and 2 (load case 1 and 2) as well as the final stage (load case 1 to 4), definition of the exploration program, development of tender documents for final work

Period of acticities: 2007