2008 – Wesel-Datteln Canal – Maintenance of Embankments, Lot II
Project
Wesel-Datteln Canal, lot II
Dam maintenance DEK-km 1,440 to 21,100
Geotechnical expertise on ground and the embankment structure
Stability and serviceability analysis of embankments
Construction Period: -
Client
Water and Shipping Authority Duisburg-Meiderich
Emmericher Straße 201
47138 Duisburg
Activities
- Exploration programme, tender documents for exploration works
- Consulting services during exploration works and construction of a groundwater monitoring well
- Laboratory tests
- Geotechnical expertise on ground and the embankment structure in 13 sections
- Stability and serviceability analysis of existing embankments
- Numerical calculations of the dam's flow through and underflow
- Slope failure calculations
- Proof of suffosion and erosion resistance
- Report on stability
- Solutions for rehabilitation in case of insufficient stability
Period of activities: 2007 – 2008