2008 – Main-Danube Canal – Stability of embankments alongside buildings
Project
Main-Danube Canal
Maintenance of embankments in canal pounds Bamberg, Erlangen, Hausen and Strullendorf
8 outlets, 10 culverts, 1 intake structure
Stability analysis of embankments in the area of transverse structures
Construction period: -
Client
Water and Shipping Authoriy Nuremberg
Marientorgraben 1
90402 Nuremberg
Activities
- Sighting of existing "as-built" documents and geotechnical reports
- Design cross-sections for fallback systems 1 to 3
- Stability and serviceability analysis of embankments in the area of the building
- Numerical flow calculations for fallback systems 1 to 3 according to MSD
- Slope failure calculations
- Proof of suffosion and erosion resistance, safety against hydrostatic uplift and hydraulic heave as well as proof of storage safety
- Checking the monitoring system
- Report on stability
Period of activities: 2007 – 2008