2014 – New Railway Line Erfurt – Halle/Leipzig, viaducts
Project
New railway line Erfurt – Halle/Leipzig
Viaducts
Ongoing consultancy during design and execution of the entire track system
within the consortium SV Geotechnik
(Partner: GEPRO Ingenieurgesellschaft, Dresden)
Construction period: since 2003
Client
DB ProjektBau GmbH
Branch Southeast
Large-scale projects, Project Section 8.2
Großer Brockhaus 5
04103 Leipzig (Germany)
Activities (still in progress)
- Technical control of final design and execution drawings of foundations of viaducts as well as adjoining embankments
- Feasibility studies on the optimisation of foundations
- 3D Finite Elements calculations regarding the realistic recording of deformations as well as the structural behaviour of foundations and abutments including adjoining embankments
- Assessment and evaluation of the monitoring of deformations using measurement technics
- Overall deformation analysis
Period of activities: since 2007