2011 – Embankments alongside the Mittelland Canal

Project

Embankments alongside the Mittelland Canal
Mittelland Canal km 67.681 to 97.530
Mittelland Canal km 90.450 to 97.470
Mittelland Canal km 101.510 to 106.600
Mittelland Canal km 107.350 to 128.00

Geotechnical report and exploration of the stability of embankments in open stretch and alongside structures

Construction period: -


Client

Wasser- und Schifffahrtsamt Minden
Am hohen Ufer 1 – 3
32425 Minden


Activities

  • Determination of the exploration programm
  • Expert consultancy and support during exploration work
  • Execution of laboratory tests
  • Geotechnical assessment of the ground and embankment structure
  • Documentation of existing vegetation
  • Development of design cross-sections
  • Computational calculation of a flow through a dam
  • Hydraulic proofs
  • Slope failure calculations
  • Stability report
  • Recommendations for measures of rehabilitation in case of non-sufficient stability

Period of activities: 2005 – 2011