2018 – Construction of a new polypropylene plant in Tobolsk (Russia)
Project
Construction of a new polypropylene plant with an anual production of 500,000 t polypropylene in the City of Tobolsk, Russia
Construction period: since 2009
Client
Linde Engineering Dresden GmbH
Bodenbacher Straße 80
01277 Dresden
Activities (still in progress)
- Assessment of existing geological reports
- Preparation of exploration concepts
- Supervision of the geological exploration
- Planning, supervision and support during static pile load tests prior to construction
- Preparation of foundation concepts
- Foundation design (shallow and deep foundation)
- Geotechnical consultancy during construction
- Construction site management for 6 months during piling work (construction supervision, reporting, SiGeKo (HSE), quality control and geotechnical construction supervision)
- Acceptance of foundations and check tests during construction for buildings, roads and parking areas
Period of activities: since 2008