2014 – Flood control reservoir Reinhardtsgrimma
Project
Rehabilitation of the Klingenberg Dam
(gravity dam with a height of 40 m, 1914) with the construction fields: Masonry construction, spillway, diversion tunnel, valve chamber, site road reservoir and Intze wedge at the masonry wall base to the waterside
Construction period: 2012 – 2014
Client
Landestalsperrenverwaltung des Freistaates Sachsen
Betrieb Oberes Elbtal
Am Viertelacker 14
01259 Dresden
Activities
- Geotechnical report, main investigation to assess the ground and foundation conditions to install a bored pile wall in dam axis as inner sealing, including exploration and laboratory tests
- Geotechnical construction supervision during the production of the bored pile wall
- Geotechnical site supervision
- Development and implementation of a quality assurance plan
- Consulting of the client during construction
- Earthwork check tests / external quality control
Period of activities: 2012 – 2014