2014 – Flood control reservoir Reinhardtsgrimma

Project

Rehabilitation of the Klingenberg Dam
(gravity dam with a height of 40 m, 1914) with the construction fields: Masonry construction, spillway, diversion tunnel, valve chamber, site road reservoir and Intze wedge at the masonry wall base to the waterside
 
Construction period: 2012 – 2014


Client

Landestalsperrenverwaltung des Freistaates Sachsen
Betrieb Oberes Elbtal
Am Viertelacker 14
01259 Dresden


Activities

  • Geotechnical report, main investigation to assess the ground and foundation conditions to install a bored pile wall in dam axis as inner sealing, including exploration and laboratory tests
  • Geotechnical construction supervision during the production of the bored pile wall
  • Geotechnical site supervision
  • Development and implementation of a quality assurance plan
  • Consulting of the client during construction
  • Earthwork check tests / external quality control

Period of activities: 2012 – 2014