2017 – Lehnmühle dam - exploration of the masonry dam
Project
Investigating the structural condition and determining characteristic values of the masonry of the Lehnmühle damn (50 m high and 520 m long quary stone wall, erected 1916 - 1931) within the scope of an in-depth investigation
Client
Landestalsperrenverwaltung des Freistaates Sachsen
Betrieb Oberes Elbtal
Am Viertelacker 14, 01259 Dresden
via:
Dr. Linse und Partner
Beratende Ingenieure für das Bauwesen
Karlstraße 42, 80333 Munich
Activities
- Tendering of boring works and assistance with the awarding of contracts
- Overhead borings up to a length of 40 m (angle of 10° to 90°)
- Coordination of boring works inside the dam
- Monitoring and supervision of boring works
- Documentation of core samples and their description
- Geotechnical documentation of of borings
Period of activities: 2016 – 2017