2008 – Upgraded railway line Hamburg – Berlin, construction section Paulinenaue – Friesack
Project
Upgraded railway line Hamburg – Berlin
2nd upgrade level, construction section Paulinenaue – Friesack
Monitoring with measuring technics of the bearing construction installed in 2003, consisting of a base course reinforced with geogrids on partially injected vibro columns
Construction period: -
Client
DB Netz AG
Niederlassung Ost
Granitzstraße 55 – 56
13189 Berlin
Activities
- Dynamic measurements to determine vibration velocity within the permanent way and within the ground and substructure
- Inclinometer measurements (measurements executed by company intermetric)
- Geodetic measurements on railways and settlement gauge (measurements executed by company intermetric)
- Sleeper void measurements (measurements executed by DB Netz AG, TZF Minden)
- Documentation and assessment of results in annual measurement reports
Period of activities: 2003 – 2008